Modelling and control 3 min
Why having data does not mean having control
Control requires relating measurements, disturbances and actions. Historical data must support response reconstruction and model evaluation on other data.
Modelling
We prepare historical process data and build models for a defined question and operating range.
When it applies
We review data, separate regimes and reserve periods for validation. We document exclusions and test the model with data different from those used for fitting.
Prepared data, an evaluated model and a report of assumptions, error and range of application.
Plant trials, equipment installation and control changes require a specific scope and authorisation. This description does not replace operating procedures.
Knowledge
Modelling and control 3 min
Control requires relating measurements, disturbances and actions. Historical data must support response reconstruction and model evaluation on other data.
Instrumentation and data 2 min
Historian data need context about instruments, operating regimes and actions. Without it, relationships between signals can mix different phenomena.
Modelling and control 2 min
Validation evaluates a model on data excluded from fitting and against a baseline. Usefulness for control also requires process conditions and tests.